Paragon Airheater Technologies | Support
 

ContactSite Map

Paragon Customers
Paragon Customers

Home
Company
Products
Services
Installations
Support

Contact Us
Media
Request An Estimate
Customer Feedback


.


< Back to Support Overview

DuraGuard™ Installation Instructions
The following instructions are for standard installation of a DuraGuard™ hopper level detector. If you have any questions, please contact us for further assistance.
  1. Select the desired sensing point on the hopper and remove a 12" (approximate) square of insulation.
  2. Cut a 4" (approximate) diameter hole in the hopper wall.
  3. Slide the mounting plate onto the sensing pipe.
  4. Slide the sensing pipe assembly through the hole with the elbow portion on the inside of the hopper.
  5. Seal weld the mounting plate to the hopper wall.
  6. Slide the sensing pipe into the hopper until approximately 12" to 14" remains on the outside.
  7. With the leveling block pointing vertically upward, place a bubble-type level on it and adjust the downward angle of the sensing pipe until level is indicated.
  8. Holding the sensing pipe in this position, seal weld it to themounting plate.
  9. Re-insulate around the finished installation.
  10. Thread the tighten the level detector onto the sensing pipeso the threaded conduit hub is pointing vertically upward.
  11. Attach flexible conduit to the ?" threaded hub on the switchenclosure.
  12. Remove the switch enclosure cover and route wiring to the terminalblock. NOTE: The switch contacts are rated for a maximum of 4 Ampsat 120 VAC.
  13. Replace the switch enclosure cover.
  14. Remove the elastic band holding the flapper to the backing plate and make sure it swings freely.
  15. If the level detector is to be tied into an annunciator or ashhandling system, it is recommended that a 10 to 15 second time delaybe built in to prevent stray or false alarms.


Home|Company|Products|Services|Installations|Support|Contact Us